Introduction
Every CO (Country Office) has a CPD (Country Programming Document), the official agreement between the UNDP and the host country.
CPDs are typically four to five years in length. They are broken down into Outcomes, typically three to four Outcomes per CPD. Each Outcome will have indicators called Outcome Indicators. Each Outcome is then further broken down into Output Indicators, which can sometimes be disaggregated further (i.e. to track separately the number of men and women reached with a particular programme).
Outcome and Output Indicators serve different purposes within a Country Programming Document (CPD). Outcome Indicators measure high-level, long-term development results influenced by various factors, including the CO's programmes and external factors such as government policies, economic conditions, and social trends. Examples of Outcome Indicators include total GDP growth and unemployment rate. While the CO's work contributes to these indicators, they are not directly controllable by the CO alone.
In contrast, Output Indicators are more specific and directly linked to the CO's programmes and interventions in the host country. These indicators measure the tangible results and deliverables the CO is responsible for achieving through its projects and initiatives. Output Indicators are within the CO's control and can be directly influenced by the CO's actions. Examples of Output Indicators might include the number of people trained, the number of businesses supported, or the number of policy documents drafted directly from the CO's work.
Each Output Indicator has a baseline and a target for the entire CPD, which then has yearly milestone targets that need to be reached. Some indicators can be cumulative, while others are non-cumulative.
Cumulative indicators measure the total progress made from the beginning of the CPD until the current reporting period. The value reported for each year is the total value achieved since the start of the CPD. For example, if the indicator is "Number of people trained," and 100 people were trained in Year 1, 150 in Year 2, and 200 in Year 3, the reported values would be 100 for Year 1, 250 for Year 2 (100 from Year 1 + 150 from Year 2), and 450 for Year 3 (250 from Year 1 and 2 + 200 from Year 3).
On the other hand, non-cumulative indicators measure progress made within a specific reporting period, typically a year. The value reported for each year is the value achieved within that year only. For instance, if the indicator is "Number of policy documents drafted," and 3 policy documents were drafted in Year 1, 5 in Year 2, and 4 in Year 3, the reported values would be 3 for Year 1, 5 for Year 2, and 4 for Year 3.
Organisational Objective
The organisational objective is to meet all milestones at every Country Office for each CPD Outcome, thereby achieving the commitments with the national partners.
Data
Outcome Names
This is being taken from the Master Project List, specifically:
The table " UNDP_CPD_SP data"
The column CPD_OUTCOME_DESCRIPTION
Donor Type Names
We take from donor_type_lvl2_descr in AITI Financials.
These are the options available:
Academic, Training and Research
Academic, Training and Research
Foundations
Foundations
Multi-Partner Trust Funds and Joint Programmes
Multi-Partner Trust Funds and Joint Programmes
Multilateral - European Union
European Union
Multilateral - International Financial Institutions
IFIs
Multilateral funds and agencies
Multilateral funds and agencies
Non-DAC and non-programme countries
Non-DAC Donor
Non-governmental and Non-Profit organizations
NGO
OECD-DAC countries
OECD-DAC Donor
OTHERS_UNIDENTIFIED
Other
Private Sector
Private Sector
Programme countries
Programme Country
United Nations System
United Nations System
Vertical funds
{Individual Name of Vertical Fund}* if available, if not "Vertical Fund — Other"
*This can be taken from "donor_type_lvl3", and we show the actual name:
Vertical fund - Forest
REDD+
Vertical fund - GEF
GEF
Vertical fund - Global
Global Fund
Vertical fund - Green
GCF
Extraction of CPD Dates
As there are no CPD Start Date or End Date columns, we manually created these using the CPD Name column that typically has this format:
Afghanistan CPD 2024 - 2025
Albania CPD - 2022 - 2026
Bangladesh CPD 2022 - 2026
Central African Republic CPD - 2023 - 2027
Colombia CPD 2021 - 2024
Outcome vs Output Indicators
Because Country Offices do not fully control outcomes (e.g., GDP Growth), we will only measure them using Output indicators. Due to the data's structure, we will filter using the "Result(s)" column for any row that contains the word "Outcome" but not "Output".
Managing MCP (Multi Country Programmes)
There are three MCPs in the data:
This is for Barbados MCP 2022 - 2026
Trinidad and Tobago MCP 2022 - 2026
Jamaica MCP 2022 - 2026
Significant Issue with MCP Data Unfortunately, there is no indication in the data as to which country within the MCP each indicator belongs to which country. So, for now, we are simply labelling the "Country" field for these as the name of the MCP. For example, the Barbados MCP 2022 - 2026 will have "Barbados" as the Country field for all indicators.
Kosovo Missing Country Name
The Kosovo Programme Document 2021 - 2025 has no value under "Country", so this has been added manually. Eventually, this will have to be resolved at the source data level in the UNDP Data Warehouse.
CPD Names to Ignore
For now, the following CPD Names are ignored for this indicator as we are focused purely on country-level programming:
Bur Policy & Prog Supp. Global - 2022 - 2025
Crisis Bur Global - 2022 - 2025
Dakar Regional Service Centre RPD - 2022 - 2025
Istanbul Regional Hub RPD - 2022 - 2025
Panama Regional Center RPD - 2022 - 2025
Reg Bureau for Asia & Pacific RPD - 2022 - 2025
Reg Bur for Arab States RPD - 2022 - 2025
Reg Bur for Europe & CIS RPD - 2022 - 2025
Reg Bur Latin Amer & Carib RPD 2022 - 2025
Regional Bureau for Africa RPD 2022 - 2025
Regional Center - Addis Ababa RPD - 2022 - 2025
Regional Center In Amman RPD - 2022 - 2025
UNDP Strategic Plan 2022-2025
United Nations Office for South-South Cooperation 2022 - 2025
United Nations Volunteers Global - 2022 - 2025
Output Indicators Missing Disagreegation Details
A significant number of Output Indicators are missing disaggregation details. Many duplicate Output Indicators in the CPD dataset have different target and results values, which hints that there are disaggregations present that are not stated in the dataset.
For instance, for "3.3.2 Number of people benefitting from improved infrastructure for recovery in crisis or post-crisis settings" for Afghanistan, we get the two identical rows in the Result(s) column with the value AFG_Output 1.3. For 2023, there are two target values of 135000 and 315000. This is likely the number of men and women tracked separately.
Handling Missing Output Indicators Disagreegation Details The process to handle these cases is to sum them together, but the disaggregation details should be provided in the future.
Handling Baselines
In the input system for CPD targets and results, there is no way to record baselines for indicators. Many COs have added additional rows for years before the CPD Start Date to indicate baselines, but this is not a widespread practice. For now, we are not using any baselines, but these are available in all CPDs and will have to be manually extracted to be used.
Restructuring Data
To simplify the analysis, we pivot the data to align with the Integrated Results and Resources Framework (IRRF) structure. This approach facilitates progress calculation akin to IRRF methodologies but tailored to the nuances of Country Programming Document (CPD) indicators.
We undertook a data transformation process to accommodate the reporting of yearly milestones associated with each Output Indicator within the CPDs. Recognizing the need for separate analyses of target and result values by year, we pivoted the dataset to generate distinct columns for each combination of year and metric type—target and result.
This transformation was executed in several steps:
Separate Pivots for Target and Result Values: Our initial action involved creating two distinct pivot tables from the original dataset—one focusing on "Target Value" and the other on "Result Value." This separation allowed us to aggregate the values for each year, thus clearly distinguishing between the set targets and the achieved results.
Column Renaming: Following the pivot, we proceeded to rename the columns within both tables to bolster clarity and maintain consistency. The adopted naming convention explicitly denotes the metric type (target or result) alongside the year (e.g., "Target (2020)", "Results (2020)"), thereby facilitating immediate comprehension.
Merging Pivot Tables: A pivotal step in our process was merging the target and result pivot tables based on their shared identifiers. This crucial action enabled the congruent pairing of target and result values for each year, thus allowing for a direct comparison. The index columns used in this merging process were as follows:
Country
cpd_name
Framework Name
CPD Start Year
CPD End Year
Indicator Definition
Data Type
Type
Result(s)
Data Cleaning and Final Adjustments: The concluding phase of our transformation entailed thoroughly reviewing the dataset for any inconsistencies or gaps, adjusting data types as needed, and addressing missing values. This phase included assigning "Not Required" to any target/result year columns falling in the future of CPD End Year range, thereby ensuring the dataset's completeness and readiness for substantive analysis.
Calculation of Scoring
Important Note on CPD Baselines
The Performance App assumes that the baseline is zero as there is no reliable system data on the baselines. A manual effort is underway to extract baselines and then to adjust the system accordingly.
Outcome % Calculation
For Outcome % calculations, we use average % results achievement of all the of the Output Indicators under that specific Outcome. One indicator = one vote, we do not agreegate or sum the results or targets.
Output % Calculation
For Output % calculations, we use average % results achievement of all the of the Output Indicators under that specific Output. One indicator = one vote, we do not agreegate or sum the results or targets.
Indicator Scoring
The indicator score is the average % of all output indicators combined. Each output indicator has one vote.
We calculate the progress against the target (i.e. milestone) for the most recent year, and take the reported Result for that year.
So, if the Target (2023) is 1,000,000 and the Result (2023) is 400,000, the % achievement of that specific indicator will be 40%
Yearly Progress (%) = ( Results for Year / Target for Year )×100
Important Note on Missing Data If a Country Office submits no data for either Target or Result, that particular CPD Indicator will be scored as zero as there is no evidence that they have achieved the target. The % of indicators that don't have full data will be displayed on the card, to assist Country Offices in updating their CPD reporting data.
Traffic Light System
The traffic light score for this indicator is the average progress of all Outcome Indicators Country Office.
Green
>80
Yellow
>=60
Red
<60
Limitations and Future Improvements
Multi-Country Programmes need to be disaggregated by individual country for reporting.
Useful Links
Executive Board Annual Session Documents — All final CPD Documents are stored here.
New Methodology based on Quantum+ Data
So while the data is in the UNDP Data Warehouse the structure is quite complex, so for now we are pulling the data from Quantum+ manually, as it is easier to deal with.
There are two extracted excel files from Quantum+:
CPD Indicator and Data — This contains the bulk of the CPD indicator data
CPD Indicator Linkage — This tell us whether each indicator (via an ID) is an Outcome or an Output
Data structure for CPD Indicator & Data
Programme Name: Name of the programme.
Geographical Area: The specific geographical area or country related to the data.
Indicator Definition: Detailed description of the indicator being measured.
Indicator Component: Indicator Component Name: Name of the specific component of the indicator.
Result Value: The actual value/result recorded for the indicator.
Target Value: The target value set for the indicator.
Reporting Period: Reporting Period Name: Name or description of the reporting period.
Type: The type/category of the data (e.g., Local, National).
Programme Indicator ID: Unique identifier for the programme indicator.
Last Modified Date: The date when the data was last modified.
Columns in CPD Indicator Linkage:
Programme Indicator ID — The ID of the indicator
Level — This can be "Outcome" or "Output"
Result Name — This is the result name, typically "Outcome 1.1", "Output 3.2", etc.
Issues we are facing:
First, we need to clean up the data by extracting the CPD Start and End dates, and only considering Active CPDs
✅ No consecutive order numbers to the outcomes, we took in order (1, 2, 3, 4) — So for instance, I-00604 has "OutCome 10", should we consider this as "Outcome 1", or do it in order?
Outcome 4/7/10/15
Outcome 1: (which is actually 4): naming UNSDCF Outcome 4: {Outcome Description/Statement}
Outcome 2: (which is actually 7): naming UNSDCF Outcome 7: {Outcome Description/Statement}
Outcome 3: (which is actually 10): naming UNSDCF Outcome 10: {Outcome Description/Statement}
Outcome 4: (which is actually 15): naming UNSDCF Outcome 15: {Outcome Description/Statement
Is it outcome description or outcome statement?
✅ More than 4 outcomes — This is fine, we can show 5 Outcomes.
Multiple numbers, 1.1.1 considered 1.1 — how to handle this?
Outputs number is not matching with existing outcomes 24.1 Output, Considered 2.1 — How to handle this?
✅ Negative Results Values — Solved,
✅ For outcomes had some values like 1.1 so we consider only the integer part(1) — Does this mean Indicator 1 of Outcome 1? For instance, I-13237 ID has this issue. Yes, we consider this just as "1"
Some output numbers like 1.24, 1.35 we consider them as (1.2, 1.3) — Need to confirm that this is the case — We consider something like 1.2.1 as Output 1 of Outcome 1.2. So the last number is the number of output, the first two numbers are what we use to match to the outcome.
Last updated